Showing posts with label Design Wall Monday. Show all posts
Showing posts with label Design Wall Monday. Show all posts

Sunday, September 7, 2025

Monday Meanderings 9 - 8 - 2025

As of Sunday we are 250 days into 2025. Wow -- this year is flying.  We've enjoyed the cooler weather but we sure could use some rain.  We got some rain but not enough. Hopefully we'll get more over the next month or so.  I did make some good progress this month.  Here are last week's goals. 

9/1/25

✅Put borders on Soho 3yd quilt from July retreat — done! 

✅Quilt another top — quilted a small baby quilt. 

✅Cut a top for October retreat — started cutting more Economy blocks 

√Clear off right side of design wall — some things have been removed but not all.

Begin cutting fabric for Magnificent Mystery Quilt from Meadow Mist Designs — the first two fabrics are done. (Minus one 2.5” square. I’ll do it tomorrow or the next day.)



This is Soho, a Fabric Cafe 3 yard quilt.  I changed it a little as I didn't have a yard of beige.  So I used one fabric for the half square triangles. I bought another fabric for the borders which I did with only one fabric rather than an inner and outer border. I'll probably use some of the beige border fabric for the backing.  


For the next quilt kit I chose to use the September UFO Challenge project.  Several years ago I made an economy block quilt and cut some extra pieces for it. This week I cut the background fabrics for all the pieces I had already cut out.  Then I pulled a bunch of additional fabrics so I could make a bigger quilt. First the finished blocks. (Yep, just 2!) 



Here are the cut pieces and a bunch of fabrics that still need to be cut. I'm using dies from my 9" Accuquilt Cube. Any cube will allow you to make an Economy block using dies # 1, 3, and 4. The triangle die for the light fabric uses a too much fabric so I'm considering figuring out the correct size and cutting them myself.  I'll keep you informed if it works.  

I did make some progress on clearing off the side of my design wall.  I forgot to take a before picture so I found one from awhile ago.  Here are the two ... 

   So, argh -- I wish I had more control of my photos!  Anyway, the left is a while ago and the right is showing I've made some progress. I moved several orphan blocks and some excess papers.  Obviously there is some more work to do. With perseverance I should be able to remove and put all of this stuff away. (Or throw it away.) 

I did get a start on cutting out the Magnificent Mystery quilt. Cheryl at Meadow Mist Designs starts her mystery quilt in the summer. She gives cutting directions for the entire quilt early on. If you cut it all at the beginning it makes it easier to make each clue as all that is needed is sewing.  I've enjoyed that part so I do all the cutting at the beginning. I will continue working on the cutting this coming week. 

Here's my plan for this week. 

9/8/25

Load and start quilting Ombré quilt

Make RSC blocks in light blue and light green and more 9 patch blocks

Cut out more Sept UFO challenge- Economy blocks

Continue cutting out the Magnificent Mystery quilt

Bind baby quilt 


I had another 100% sewing week. 


W/ending 9/7/25. 250 days of 2025

    • 15 minute days Sept = 7/7
    • 15 minute days/2025 = 250/250 days
    • Success rate = 100%
I hope you can spend some time checking out some of the Linky parties -- don't you want to get some new ideas? (Ok, so I get way too many ideas every week and have enough of my own ideas but I still get excited about what I see each week.) 


I'll leave you with this wonderful picture I took while walking this week. Yep that's hubby with Sunny. I stopped to get the picture. 


We didn't get the rain but we got this huge rainbow.  For a short while there was a double on the left hand side but that picture wasn't very good.  

Happy quilting all -- Bonnie 

Sunday, August 31, 2025

Monday Meanderings -- 9/1/2025

I can't help but rave about our weather in the Mid-Atlantic region.  The humidity has been low. The temps have been in the low 70s to the high 70s.  But wait, there's more! We woke up to the high 50s a couple of times this week.  Amazing.  So much nicer than it has been recently.  And yet, I did spend a lot of time in the studio this week instead of outside.  

Here are last week's goals with a bunch of green check marks. Yea! 

8/25/2025

✅Bind Space quilt and ✅ Red, White and Blue quilt — both done! 

✅Quilt another small top — little quilt went fast! 

✅Cut a top for October retreat — Hens and chicks cut out!

✅Finish Cali-Co block — done.

Keep working on project bag — got another section done.


Here's the Red, White and Blue Sampler quilt done. (I took this on the floor in the studio, not outside so the lighting isn't as good as I wish it were.) I need to figure out why the borders are waving more than I expect them too.  Any one have suggestions? 



You can't really see the quilting design on it but it is Quick and Easy Stars by My Creative Stitches.  I like it because it does go quickly and it is easy! 


I quilted the little Happy Quilt from last week. It was less than 36" square so I only needed 1 1/4 yards for the backing and I found it in my stash. And it went really fast!  I'll share photos in the future.  


I finished cutting out the pieces for Hens and Chicks.  You can see the pattern and the 3.5 (unfinished) 9 patches on the May 5 post. (It's close to the bottom...) First are the 3.5" bright squares. And then all of the background fabric except the border and binding.  I'm looking forward to getting this to top stage.  I think I have some bright green fabric for the borders. May be there will be enough for the backing too. (dare I hope so?) 




I was happy it didn't take all that much time to tear out the stitches from the August Cali-Co block.  And I didn't have to start over -- for the most part the center blocks minus the 4 corners were ok.  Here's the finished block. 



And here are the first 8 blocks together.  I really like how this quilt is coming along.  (Hum, is this going to be another keeper for me? It could be...) I just slapped these up on the design wall.  I'll pay more attention to colors once they are all done and I want to finish the top.  


And now, what I hope to work on this week. 


9/1/25

Put borders on Soho 3yd quilt from July retreat

Quilt another top

Cut a top for October retreat

Clear off right side of design wall 

Begin cutting fabric for Magnificent Mystery Quilt from Meadow Mist Designs


My next retreat is only 6 weeks away. I hope to have 6 projects to take with me. If they are really easy I can easily make one a day. Two kits are done -- one left over from July.  I have a paper piecing project I want to start now and see if it would be easy enough to work on at retreat. Maybe not the whole thing but a couple of sections finished would be great. It would be good to have a couple more 3 yard quilts to work on too. 


Sunday we decided to go on an adventure -- well an adventure for us as we had never been to the Virginia Scottish Games.  We weren't going for the games as much as for the Scottish dogs.  There are 13 breeds that come from Scotland.  You can read more about which breeds come from there here. I'll wait if you want to check it out ... lalala ... right, you're back.  Did you read the list to the end? Yep? Well guess who is a Scottish breed?  Yes, our own little Sunny dog.  We thought she might like to meet some dogs that look like her.  And she did.  Westie Rescue -- Mid-Atlantic Region had several dogs looking for homes and a bunch of Westies who had been adopted through them were there for Sunny to meet and greet. Here's some photos of our morning and early afternoon. 


Sunny is the dog in the back.

Each day there is a parade that includes a bagpipe band, a showing of the clans and the walking of the Scottish dogs. Usually the dogs are at the back of the parade. Except this year they ended up being at the beginning of the parade.  No picture of Sunny in this group -- she was behind, closer to the end. (I believe the brown dog was with one of the spectators to the right.)

There was also a Wheaton Scotty dog and a Black Scotty. 

After the dogs, the bag pipers marched out. Below is a 30 second video I took of the bagpipers with some of the dogs walking at the end. The last two dogs are the Wheaton and Black Scotty.  Sunny is right in front of them. 


I can report I stitched every day this week.  Here are my current numbers. 

W/ending 8/31/25. 236 days of 2025
    • 15 minute days/August = 31/31
    • 15 minute days/2024 = 243/243 days
    • Success rate = 100%

One more thing to report this week.  Some of you know I read a lot and try to read every day on my Kindle. I'm sadden to report I forgot to read one day this week.  (Silly me, I put an extra 15 minutes in knitting after I'd spent half the day sewing!) I was just beyond 500 days and, sigh, I was knocked back down to zero. Today I'm up to 5 days.  The positive note is I've read 371 weeks in a row. That is over 7 years in a row.  Not too bad, eh? 



As always I link up with several different parties. Please take some time to visit these sites and see what others are working on.  I apologize for not linking up the other two parties last week. I don't know why I forgot about it but I did.  Sigh


I hope you make time for quilting or stitching every day.  I know with all that is going on in the USA now it helps me find peace and calmness.  


Happy Quilting All!  Bonnie 

Sunday, August 24, 2025

Monday Meanderings 8 -- 25 -- 2025

Hello All!  We've been traveling this past weekend.  I've gotten some knitting done but no quilting. It has been raining most of today but we did do some outlet shopping.  A concerted effort was made to have most of my goals from last week done before we left. Take a look!

8/18/25

✅Keep working on project bag — made some progress.

✅Quilt RWB Sampler — finished, next up binding.

✅Make some more blocks: RSC, — RSC, some 9 patches, and started Cali-Co mom.

✅Sew current Happy Blocks into a top — done!

Finish current hat. — done except pompom.

I didn't take a new picture of the project bag but I did decide I would only work at it at home to avoid more mistakes.  Hum, who knew talking would distract me so much! 

No photos of the quilted RWB sampler quilt but it is all quilted. 

Here are both of the RSB teal blocks. Last week I showed the more colorful one. This week it is the two together. I need to spread all of the blocks out to see how they look together. 


Earlier in the week I worked on the current Happy Block quilt. With the help of my friend Beth we came to a decision about placement.  Here's the end result.  I think I made a new block to replace one of the dark ones. (It's second row, third block. Both fabrics were from the 25 yard haul. Unfortunately the cute animal print is only a 6" WOF piece.)  The dark ones (that mostly show when I turn the picture to gray scale) are in a diagonal row from top left to bottom right.  It's hard to believe that red often looks really dark when seen as on the gray scale.  

Now let's see what I hope to do this week. 

8/25/2025

Bind Space quilt and Red, White and Blue quilt

Quilt another small top

Cut a top kit for October retreat

Finish Cali-Co block

Keep working on project bag


That seems like a big list although I don't have a lot of commitments this week. We'll see how I do. 


The other thing I'll admit is I totally screwed up the Cali-Co bom for this month. I failed to put on the second frame before I put on the triangle corners and trimmed the block.  UGH. The block was 2" too small and I sliced into all four corners before I realized my mistake. Jack and I were getting too well acquainted this past week. I won't have to remake the whole block but I need to take out each of the corner blocks in the center. Sigh. Shouldn't take too long if I can keep focused. 


Another successful week of stitching 15 minutes every day.  (If I get this post done soon enough I'll be able to get today's 15 minutes done.) 


W/ending 8/24/25. 236 days of 2025

    • 15 minute days/August = 24/24
    • 15 minute days/2024 = 236/236 days
    • Success rate = 100%

Here's an older quilt that I made for our beach house.  I decided to bring it home and substituted a quilt with ocean fabrics - whales, star fish, and the like.  These Wild dogs just make me smile! Too bad there isn't a West Highland Terrier like Sunny! 



I'm linking with the following parties. 

Stitching Stuff

Oh Scrap

Design Wall Monday 

Monday Musings


I hope you have a quilty week. Keep your spirits up and your hands doing what you like to do! 


Happy Quilting! Bonnie 



Sunday, August 17, 2025

Monday Meanderings 8 -- 18 -- 2025

This past week was quiet for me -- especially after all the fun and action while my friend was visiting. I took afternoon naps... not necessarily on purpose. I would be reading after lunch on the sun porch and all of a sudden I would wake up an hour later with my Kindle in my lap and feeling way too warm.  I figured I must have needed the extra sleep.  I did finish some books and  I've halfway finished another ebook.  Although I did pretty well on my goals I didn't spend as much time being productive in the studio. 

8/11/25

✅Keep working on project bag — one sheep done. 

✅Read a book or two — finished 2 audio books and 1 ebook.

✅Wash and iron new fabric and put it away — only a few pieces to finish.

✅Quilt one of my tops — a RWB sampler quilt is loaded. 

Make blocks for various projects — 3 blocks made, more still needed to be done.



This red, white and blue sampler top was from Sherri McConnell's block of the month in 2022.  Earlier this year I put the blocks together with sashing and borders.  I have to say I really like this top.  I've decided to keep it rather than give it to my local quilt guild to give away.  We have a quilt hanger in our entry way which can take this size quilt so that is the plan for it.  I probably won't get back to quilting it until Tuesday.



Here's my Rainbow Scrap Challenge block in aquamarine.  Unlike my normal method, this month I decided to focus on turquoise fabrics that lean more to the green side.  I haven't made the opposite color way with more light blocks yet.  Hopefully I will get it done this week. 

I also realized this week that I missed some of the monthly colors for RSC this year. I need to make blocks for orange and purple. I'll be trying to get caught up on those colors over the next several weeks. 


Here's the last Happy Block I made using the popsicle fabric I used at the retreat. 



I've got another Happy Block quilt almost ready to sew together.  Here's the current layout. 



The blocks need to be moved around a bit still. Because these blocks have all sorts of colored frames I like to look at the grayscale version.  Hum, just what I thought. There are three blocks that read dark in column three.  I think I've substituted some thing else for the 4 row, 2nd column block also very dark. I'll be playing around with these using this photo as my guide.  Hopefully I'll be able to finish the top and find a backing for it soon.  


Here's my plan for the upcoming week. 

8/18/25

Keep working on project bag

Quilt RWB Sampler 

Make some more blocks: RSC, nine patches with the white center,  

Sew current Happy Blocks into a top

Put borders on a 3 yard top and possibly quilt it.

Finish binding two quilts. 


I've maintained my 15 minutes of stitching this week.  I knit hats for an organization that needs around 300 in the fall so I always have a hat on my needles and can knit a couple of rows to make up my stitching time each evening if I haven't already done some quilty "stuff." 


W/ending 8/17/25. 222 days of 2025

    • 15 minute days/August = 17/17
    • 15 minute days/2024 = 222/222 days
    • Success rate = 100%
I keep finding mistakes in my postings.  I'm pretty sure next year I'll change up this report to make the math more accurate or easy.  Did I ever mention that I went to 11 different schools from kindergarten through high school? Once my folks took me out of public school to put me into private school. Sometimes I went to a different school in the same school district. And, a couple of times we moved mid school year or at the beginning of a school year.  What I finally figured out rather late in life is I did not have a good grounding in arithmetic.  I'm lousy at math in general. I say all of the above to explain why I keep finding mistakes in my stitching reports! I do know that 222 days is as of Sunday, 8/17. So this report looks accurate. 

That pile of new fabric I shared last week has been ironed and put away with the exception of the top fabric. This week I washed 5 or 6 yards from a bolt of fabric I purchased from Marshall Dry Goods. It's a mottled beige and I plan to use it as the borders and backing of one of the 3 yard quilts I started at retreat. If I get the borders done I'll share pictures then. 

As usual I am linking up with four Linky parties.  Please take a some time to visit and check out some of the blogs that are listed on the parties. I keep getting way too many ideas but I like to see what everyone is working on! 


And before I call it a night I want to mention the administration's assault on Washington, DC.  DC is not a state although they would like to be. Because they are a federal district the administration can send troops into the city to patrol. From local news reports these troops have been working in the areas that are more visible -- near where federal buildings and parks are located.  One of the things that has been said is that DC is a crime ridden area.  That there are awful people in the city.  Just to put the record straight DC's crime rate is down. "Total violent crime for 2024 in the District of Columbia is down 35% from 2023 and is the lowest it has been in over 30 years, according to data collected by the Metropolitan Police Department (MPD) and announced by United States Attorney Matthew M. Graves." You can read more about it here. 

One of the scary things about federal troops "policing" the District is they have no training in that area.  I keep waiting for some one to be killed or seriously hurt because of the wrong people "policing" the area.  

I, for one, do not think DC is in an emergency and it does not need federal assistance.  I am hoping that the troops are only there for the 30 days allowed for  this "emergency".  America is NOT a police state.  

That's it for me.  

Happy Quilting All! Bonnie