It was a great week! Retreat is over and I'm exhausted. But what fun we all had. There were 7 of us sewing in a space that was actually designed for scrapbooking. I failed to take pictures of sewing area. So here's a verbal description. We each had a table to set up on. Then there were tables for an iron and for cutting mats. Those two tables were on risers so they were at a comfortable height. There was also a snack table and an extra refrigerator. There was also a bedroom and bath downstairs. Upstairs there was a kitchen, dining room, living room, one bedroom and access to a beautiful screen porch. The next floor had two more bedrooms and a bath room. A nice set up for us.
Here're my goals from last week.
7/13/26
✅Pack up sewing projects & supplies and travel to retreat! — arrived, sewed and came home.
✅Work on projects most are groups of blocks to make into tops — most were moved forward or finished.
Prep Snowman #3 for hand appliquéing— started but not finished.
7/20/26
Knit on a new hat
Work on Snowman #2
Finish prepping Snowman #3 for hand appliquéing
Cut more blocks and sew turquoise and green baby quilt together
Load a quilt on Ruthie and quilt it.
I had a really successful retreat. I brought 8 projects to work on. Most were blocks needing to be put into tops. One was a new quilt cut and ready to sew. Here are some of the projects.
This economy block, along with about 7 others, was made at retreat. Then I laid out all the blocks on my design bed. And, then I moved blocks around. Took photos and turned them into greyscale. And again and again. After an hour or so I decided I needed to reevaluate the blocks. They were a variety of fabric colors and styles. I finally decided to put these basic in their pouch and look at them once I got home. My guess is I'll make some more blocks that are medium and then the quilt will look more balanced. A lot of the blocks looked really dark when turned to greyscale. So I went on to something else.
I started this quilt with the little 9 patches which are 3" in the quilt. I actually cut out the other parts for last October's retreat. I sewed this top at retreat. Except, I didn't cut the colored border. In fact I have no idea what fabric I'll use for the border. I'm hoping to get it finished sooner, rather than later. I might have a fabric that will work. I'll keep you posted on this one.
Next up I pulled out the blocks to make this little baby quilt. It's a 64 square quilt,
set 8 x 8. It finishes 36" square. The squares are cut 5" and finish at 4.5". Are you asking why I made these blocks 5"? It's because I have a 9" Aaccuquilt Cube. The big square turns is 5". My other choice would have been 6" finished which seemed too big for my fabrics. The fabric was a kit from Craftsy when they were going out of business. It all is sea motifs. Whales, clams, bottles in the sea, etc. I may have enough fabric left over for a second one. I think I have yardage of one or two of these fabrics to use as backing.
Not a great picture but this is the one totally new quilt. I used one of my Quilts for Baby books by Ursula Reikes. The Eiffel Tower fabric was free on a give away table at one of my quilt guilds. I didn't bring both pages of the directions -- only the sewing it together part. I still need to cut the border and apply it. Again, I'l need to find backing for it eventually.
And, that's my trusty Featherweight that really sewed a lot this past week. One thing I learned is the Singer needles are not any good. I'd changed the needle in it for the only needle I had with me, from Singer. The stitches were awful, skipped, big and poorly formed. Luckily a friend had recently taken a Featherweight maintenance class. The instructor said the Singer needles were awful. She gave me a new needle and that Featherweight sewed like a champ for the whole retreat. Phew!
My last project did get started. You can see one of the blocks here on last week's post. It's the watermelon Happy block. I didn't take any pictures of the rest of the blocks I made during the week. Again, something I'll be working on over the upcoming weeks and months too. I think all the blocks are ready to be sewn into rows and a top.
So, yes, I made forward progress on a lot of projects. Most need more progress to get to top stage. But WOW I was amazed how many projects I worked on and made good progress. I have another retreat in October -- so I'll need to get another group of projects ready to finish or at least move forward for it. Who knows, I may wait 'til then to finish some of these projects.
NEWS ALERT!
I didn't do any stitching today! In fact, I forgot all about it until a few paragraphs back! So here are the numbers.
Week ending 7/19/26: 200 days of 2026.
199 stitching days out of 200 days 99.5%
I'll start back up tomorrow. At least I got reading on my Kindle done. Now it's time to remind all to check out these Linky parties.
One thing I didn't mention is I took most of my tools and projects down to the sewing room when I got home. Tomorrow I'll only have to take down a few things. Of course, then I'll need to put everything back away. Hopefully it will all be put away by lunch.
Happy Quilting All! Bonnie



















