What a week we've had -- or at least our weather has had. Thursday it was in the high 70s. Then it started getting colder, and it snowed. That night it got down to the 30's. See the pic below -- it had dropped 44 degrees on Thursday. The snow didn't last long but it was wet, and was snowing hard for an hour or so.
3/9/26
Finish Feb UFO to top stage — nothing was done.
✅Stitch on Snowman block — Several sections were finished.
✔️Trim March UFO blocks — 10 of 42 blocks were trimmed. More to go.
✅ Sew Magnificent Mystery blocks into rows — done.
✅ Finish knitting sock — done.
Here's a pic of my finished socks. The first sock was finished months ago. I started the second one and got to where the heel started and quit. Fast forward many months. It took me about 2 weeks to get the second one done once I started knitting again. I wore them today. Pretty comfortable and not horribly hot.
I know you are wondering why I didn't get much done this last week. A customer called me with a top to be quilted asap. I didn't get a very good picture of it but I did get it finished. On Thursday (see weather report above...) there was a blip of electricity and Ruthie quit working. Bummer. I quit for the rest of that day as I didn't want the quilting to be messed up and started again on Friday afternoon. It was done by Saturday evening. And returned on Sunday. Margery used a lot of horse prints including a panel of horse prints like on the bottom left below.
3/16/26
Sew Magnificent Mystery rows together
Continue trimming March UFO blocks/take out papers
Quilt Springtime Irish Chain
Make more Dash blocks
Finish 1st Snowman block
Oh! And the fabric from Marshall Dry Goods arrived. About 7 pounds of fabric according to the shipping label. I went a bit wild buying wide backs. Here's group 1.
The pink and blue are each 2 yards of 108 fabric. The red, white, and blue is just a yard of 45" wide. It was a little treat -- ie, I have nothing specific planned for it. But I'll probably make a 3 yard quilt with it. And now, group 2.
The top one was "suppose" to go with the Magnificent Mystery top except it is way more orange than I thought it was. It is a beautiful fabric and I'll find some way to use it although maybe not as a backing. Underneath is white Dream Cotton Solid 108" wide. I'll probably use it as background fabric. It has a great hand.
I did actually sew every day last week.
Week ending 3/15/26; 74 days of 2026.
74 days of 74. 100%
Here are the Linky Parties I'm linking with. Take a few minutes to visit the blogs listed.
Design Wall Monday
Monday Musings








No comments:
Post a Comment
Thanks for visiting. Let me know what you're thinking about.