We enjoyed some beautiful weather over the last week or so. Temps in the low 70s and low humidity. It's been lovely. Unfortunately the first week of June shows temps going up to the 90s with humidity. Bummer. I tend not to bake (cookies, brownies) when the temp hits 80+. We have a kitchen that opens into the living room. Heating the oven heats the main part of the house. It doesn't make for comfortable tv watching or reading in the evening.
So, my goal list doesn't have a bunch of ✅ this week. I didn't realize how long it would take me to make the 2 pillow shams I finished. Here's what got finished and what was left out!
5/25/26
✅Stitch on Snowman #2 — made some progress.
✅✅Make pillow shams for Ombré Log Cabin quilt — 2 done but they need a little more work to look better.
✅Knit 2 kids size beanies — finished one and started and finished #2.
Make some hollow 9 patches — nothing done.
Trim Bargello quilt — Didn’t trim; need to buy binding first.
Quilt one of my quilts — didn’t happen!
We've had the Ombre Log Cabin quilt on our bed for about a month. It looked funny with pillow "shams" that were just white pillowcases. So I decided it was time to make shams. Unfortunately, I need to stitch about an 1 inch inside the edges of the sham so it stands up (hopefully). Right now, this works but the shams are a bit floppy.
I finished 2 beanies and found another one finished in my knitting bag. We were asked to use bright colors and make kid friendly hats. I generally give them to a friend of mine who turns them in every couple of weeks. Hopefully I'll see her tomorrow at our weekly stitching meeting and she'll be able to turn them in.
I use a pattern that allows me to knit the hat flat and then seam up the back. I find it easy to knit and doesn't take long to do the finishing work. I've been making these stripe hats with two rows of color followed by 2 rows of the white. It sure helps to use up the little bits of yarn left from making other hats. I decided to skip the pompoms on top as I worry about them falling apart too soon. I'll see how many more I can get done before the summer program passing out school clothes.
Here's what I will be working on this week.
6/2/2026
Quilt two of my quilts
Make some hollow 9 patches
Knit more kid-size beanies
Stitch on Snowman #2
Cut one quilt kit
My June UFO project is a fall top. All I wrote was Fall Blocks Top. Hum, I sure hope it will be obvious when I check for it in my quilt closet!
I had another successful week stitching.
Week ending 5/31/26: 151 days of 2026.
151 stitching days out of 151 days. 100%
I did not attend the estate sale again this week. For the most part I forgot all about it. So no new things to share.
We went out to dinner and a concert this weekend. We left way too early so after dinner we went to a deli/bakery to have a piece of carrot cake. It's our favorite cake. Here's the cake:
As usual I'm linking up with these parties.
Not much else is going on this week until Saturday. The Spotsylvanians will be singing the national anthem at the Fred Nats minor league baseball game. This is the fourth year we've done it. It's always a fun event.
Happy Quilting All! Bonnie



Your knit hats look great. I have been crocheting some to use up more yarn. Love the pillow shams. I never use any as I am in to big of a hurry to make the bed to take time to shove the pillow in!
ReplyDeleteThe pillow shams look great, Bonnie! They're really pretty with the quilt on the bed. We recently went on a trip to Charleston, SC, and discovered Publix for their sub sandwiches - we got some for lunch a couple days in a row. Too bad I didn't know about the carrot cake there, too!
ReplyDeleteFabulous quilt pillow shams, Bonnie! Looking good from here. As does the cake. Triple layers. Fancy. Good thing to share at that price. Now you have me wondering about the music choices!?!
ReplyDelete