I hope all of you are safe and healthy after all this bad weather that has been spreading across the US over the last few weeks. Local weather people keep saying we (the greater DC area) were going to get heavy rain. We all need it. But, as usual the clouds seemed to split over our area and go north and south. We did get some heavy rain this week but it was no where near enough. I'm sharing our 9 day forecast via Apple's weather app on my iPhone. It'll change every day, or so it seems every week. I'm just hoping the days with 100 as the high actually changes to lower temps before the days arrive. I'm not holding my breath on that happening though. And this doesn't show the humidity going sky high also. It's going to be humid too. My basement studio sounds really good this week. **The weather has changed overnight! We'll have 2days of 100+ temps, and rain only on Monday. I expect it will continue to change everyday. Sigh. At least 7/4 is "suppose" to be dry instead of rain!
6/29/26
Finish sewing table runner together
Quilt another section of June UFO project
Work on Snowman #2
Start clearing out “stuff” to prep for new carpet in bedrooms
Sew more Veronica blocks
Make more string blocks
Enjoy 4th Of July party in neighborhood
The only non-quilting item on the list is clearing things out of closets and dresser tops. We have been doing some updating of our house. Before the new carpet comes in the master bedroom and bathroom will be painted. Here's a pic of one of the new counter tops in the bathroom. We got rid of the previous counter tops -- builder's grade that was turning yellow. We have two sinks/cabinets in our bathroom. So two new sinks and quartz countertops have been installed. Plus we also replaced the granite (that was pitted and rough) in the kitchen with a similar looking quartz.
It is going to be interesting getting everything moved out of the guest room closet -- it's packed floor to ceiling. Hopefully some of the stuff will be given away. But I do need to start working on it now!
I've changed my mind about making more new kits to worked on at retreat. Currently I have 2 kits ready to go. But I'll need a lot more projects. I've gone through some of my project bags and found several that I could work on at retreat. Here's a pic of the string blocks I've been working on. These blocks are finished and ready to sew together. I have another group that are sewn but not trimmed. And I need to get 7 more made, preferably before retreat. I've pulled several other project that are partially done to finish up at retreat.
Another week with 100% of 15 minute stitching! Whoopee!
Week ending 6/28/26: 179 days of 2026.
179 stitching days out of 179 days. 100%
And, here is the last quilt Sharon quilted on Ruthie when she was here.










I love your lilies. Our Callas have opened more in the last 2 days. I should bring a couple in the house. Your new retreat runner will be really pretty with those fabrics. The new updates in your house will be wonderful, love the sink/countertop. What kind of carpet are you getting, I ask because we need new carpet in several rooms and the steps and I have not even looked at any.
ReplyDeletewe have remodeling to do too heaven knows when it will all get done.
ReplyDeleteYour table runner looks pretty, what a great idea to leave it at the rented house! There are some cute prints in your string blocks., and wow, I love Sharon's quilt! Have fun at the retreat, and thank you for sharing and linking up!
ReplyDelete