I've had a set back this week. I was using one 108" wide back and planning on putting two different quilts on it. First quilt was done, no problem. I left it on and rolled to the backing and batting for the smaller quilt. It is a small one and didn't take long for me to start the computer quilting. Except, after the second row I noticed there were big loops of thread on the underside in one particular area of the design -- across the whole quilt. UGH! I'd checked it when it first started but it was only one direction of sewing that was screwing up. I stopped it. Checked the thread path and found that the thread had caught on something.
When I really looked at it I realized there was no way I could finish it. I have spent about 5 hours so far ripping out the stitches on both rows. (Heck, it was only going to be 4 rows!) By Saturday I realized I wanted to get more done this week than that quilt so I went back to sewing on the domestic. I will say I wasn't thrilled with the look of the pattern so when I reset it I'll add another row. But talk about a boring task! Thank goodness for audio books!
I did pretty well on my goals this week despite the amount of time I spent on unstitching with Jack the Ripper.
10/26
✅Quilt large flying geese top — done!
✅Trim and bind Halloween stitchery — Done and it is hanging in our great room.
✅Sew 10 Marigold Mystery Oct blocks — Done
Bind second blue quilt from 9/28 — Not even looked at!
✔️Finish one brick top — Just 2 seams still needed.
These big flying geese blocks were from a block swap at a retreat many years ago. I decided it was time to move them out of the UFO pile this year. I added some more blocks, made the top, and finally quilted it. It is all batiks. I need to trim and bind it but am not sure what I'll use to bind it.
Here are 5 blocks for the Marigold Mystery October clue. This month we made 15 4" finished blocks. So far we've made 8" and 6" finished blocks. Hum, I wonder where this is going?
On to this week's goals. More is happening in our lives -- I hope I can get these items done this week.
11/2/26
Bind second blue quilt from 9/28
Finish all seams on brick quilt
Pull out Christmas Tree project and quilt more of it
Baste Sewing Machine quilt and begin quilting it
Clean up around sewing machine!
I had another successful week of sewing (and unsewing!)
Week ending 11/1/26: 305 days of 2026.
303 stitching days out of 305 days 99.3%
Here's is a baby quilt I finished a while ago. I took it to retreat in October to donate to the guild that sponsors the retreat. Yep, I have maintained my membership in it mainly because I really enjoy the retreat. Hum, I look like I haven't had enough sleep! (And, I never sleep all that well at retreats.) I wanted to use up the bear fabric (an old fabric in my stash) and liked the windmill blocks with it. I used Criss Cross Applesauce by My Creative Stitches for the quilting.
YIKES -- It's only 60 days until the end of 2026. I haven't thought much about Christmas except to work on the grand's ornaments. It's been rather slow going but I am making progress. And, once I get some embroidery done it will speed up nicely. 🤞Or so I think.
Election Day is Tuesday. If you haven't voted -- plan on going on Tuesday. I'm quite proud of my family: Our oldest grand* and our daughter are election workers in Maryland. *They are 16 and will be working from 6 am to 7 pm according to our son-in-law. Hubby is a poll chief in Va. He's been working at least once a week since early voting began. It's been very busy during early voting and he's expecting it to be really busy on Tuesday. I will be home quilting, reading and keeping out of mischief!
Remember to take a look at these Linky Parties - Stitching Time, Oh Scrap, Quilting Patchwork Applique, Design Wall Monday, Monday Musings.
Happy Quilting All! Bonnie





No comments:
Post a Comment
Thanks for visiting. Let me know what you're thinking about.