We've had a lovely week in the great DC area. The weather was dry and relatively cool considering what most of the summer has been. I'm not complaining about mid 80s and high 70s. But wait. Summer is going to give us another blast of heat this week. It's suppose to be 100 degrees on Wednesday. Can you say "to the basement to sew?" I'm hoping the forecast will change between now and Wednesday. But the basement is generally cool and comfortable even in extreme heat.
I had a decent week working on goals. For the most part I got something done on all my goals, even if I didn't finish most of them.
8/19/24
✅Cut a 3 yard quilt kit — not a 3 yard quilt but another kit ready.
✅Arrange and sew snowball blocks — first 2 rows sewn together (blocks that is!)
✅Start a new quilt using a horizontal panel — trimmed panel and tried a couple of ideas.
✅Keep working on seaside top — Getting closer but not finished yet.
✅Begin grands’ Christmas ornaments — cut out and started sewing first one.
Here's what the final snowball blocks layout looks. I replaced one of the blocks that turned up so dark you couldn't see the shark in it.
8/26/24
Quilt pink & turquoise Picket Fence top
Finish sewing snowballs together
Try some 3" squares on panel sides. Make decision on which size to use and cut them out.
Keep working on grands’ ornaments
Cut out another quilt kit or two
I made a couple of 6" Maple Leaf blocks to try on the panel. It doesn't matter if I use them or not as they are being used at the October retreat as an opportunity block. I'm either ahead of the game for the retreat or I'll put them to use on the panel at some point. Here are the two I made:
I had started a whole quilt of 8" Maple Leaf blocks using my Go die. But I put those away for a while. I've got a trip to Sharon's planned for mid September so maybe 8" Maple Leaves may be kitted up along with the whole panel project to work on there. With retreat in October I'm going to need a goodly number of kits for both events.
My neighborhood has a craft group that meets twice a month. I try to go when I can and I like the project. Last week it was a cute pumpkin. Here's a pumpkin patch -- some of the examples and the ones we made. Mine is on the left side that is bright orange with orange and yellow polka dots. I brought supplies home to make two more so eventually I'll have a cute display for the dining room table. The big black thing is also a pumpkin but it was so big it overpowered the little pumpkins.
I've been stitching everyday this week. Yea!
W/ending 8/25 — 238 days in to 2024.
- 15 minute days/week = 7/7 days
- 15 minute days/Aug = 24/24 days
- 15 minute days/2024 = 229/238 days
- Success rate = 96%